威尼斯人官网-澳门威斯尼人平台登陆

Well Service Equipment

Well Service Equipment

Global Cutting-edge Intelligent Oil & Gas Equipment R&D Manufacturer

Since 2004, Jereh has been dedicated to providing oil & gas field equipment and integrated solutions for global customers. There are several industrial parks covering an area of 570 acres to conduct one-stop manufacture under one roof. Leveraging sustained technical innovation, Jereh self-developed ZJ70 drilling rig, turbine-driven frac pumper, intelligent CTU, nitrogen generator unit, electrical frac pumper and 2250 HP cementing unit have been widely applied and recognized across the world.

Key Products


  • Drilling & Workover Equipment
    Facing the different challenges in oilfield exploration, Jereh has been enhancing R&D innovation and providing full series of practical drilling and workover packages. 
    Drilling & Workover Equipment
  • Cementing Fleet
    All-weather cementing unit is applicable to various operation conditions such as onshore, offshore, arctic and extremely hot conditions.
    Cementing Fleet
  • Frac Spread
    Jereh frac spread consists of fracturing unit, sand blender, chemical additive unit, manifold unit, hydration unit and data vans, etc., helping global customers complete every stimulation job efficiently and safely.
    Frac Spread
  • Coiled Tubing Fleet
    Controls are integrated on one handle to realize intelligent operation of injector and tubing reel, lowering skill requirements for operators.
    Coiled Tubing Fleet
  • Nitrogen Pumping Unit
    The vaporizer with eight independent combustors employs pilot ignition and the ignition quantity is controlled automatically, delivering high fuel efficiency.
    Nitrogen Pumping Unit
  • Efficient Heating Equipment
    Jereh intelligent control system permits one-key setting and automatic temperature regulation.
    Efficient Heating Equipment
  • Plunger Pump & Spares
    Jereh has a complete series of high pressure plunger pumps, ranging from 500hp to 5,000hp, suitable for various applications such as cementing, acidizing and fracturing. 
    Plunger Pump & Spares
  • Simulation Training System
    It is self-developed by Jereh based on real job conditions. The simulator provides a real-life operational environment through use of 3D virtual technology to help the operator learn and grasp the operating skills quickly.
    Simulation Training System
  • Flowline Products
    With years of experience and research on customer needs, Jereh has successfully developed flowline products suitable for both standard and sour operating conditions.
    Flowline Products
  • Well Control Equipment
    In conformance with API 6A and NACE MR0175, Jereh well control equipment including BOP, stripper packer, lubricator and hydraulic connection union are key units for safety operation of coiled tubing.
    Well Control Equipment
  • Wellhead Equipment
    Jereh wellhead and Christmas tree products are designed in compliance with API 6A and NACE MR0175, ensuring safety and reliability. 
    Wellhead Equipment

Global Applications


3100 HP Frac Spread in Sichuan, China

Flowrate: 7.5-11.9 m³/min (47.2-74.9 bpm)

Continuous Working Pressure: 70-80 MPa (10,150 psi-11,600 psi)
Max. Working Pressure: 87.19 MPa (12,643 psi)


Trailer Mounted CTU in Canada

Tubing Size: 2 7/8"
Ambient Temp.: -43℃


2250 HP Frac Spread in Kazakhstan

Max. Pumping Pressure: 40 MPa (5,801 psi)

Total Fluid Volume: 50 m³

Total Sand Volume: 20 t


Skid Mounted HR Nitrogen Pumping Unit in Tunisia

Flowrate: 55 L/min ( 14.5gpm)
Ambient Temp.: 45℃

Trailer Mounted Twin Pump Cementing Unit in Poland

Slurry Density: 1.83 g/cm3 (15.3 ppg)
Slurry Volume: 9 m³ (56.6 bbl)
Working Pressure: 10 MPa (1,450 psi)


3100 HP Frac Spread in Sichuan, China
Trailer Mounted CTU in Canada
2250 HP Frac Spread in Kazakhstan
Skid Mounted HR Nitrogen Pumping Unit in Tunisia
Trailer Mounted Twin Pump Cementing Unit in Poland
TOP
XML 地图 | Sitemap 地图